Overview
Work History
Education
Skills
ADDITIONAL INFORMATION
Certification
play instrument, do sport, listen musik
Languages
Summary
Accomplishments
Work Availability
Work Preference
Software
Interests
Quote
Timeline
Generic
Farhoud Nicknezhad

Farhoud Nicknezhad

Saveh

Overview

14
14
years of professional experience
4
4
Certification

Work History

Designer, Supervisor of mechanical Facilities (as1st grade)

01.2014 - Current
  • Designer of mechanical facilities
  • - Designing mechanical and plumbing systems including: HVAC, domestic water, storm, sanitary/vent and natural gas systems using SI and Iranian standards
  • - Assisting in the preparation of deliverables and products such as: presentation materials, calculations, drawings, specifications, and cost estimates; related to heating, ventilating, and air-conditioning (HVAC) and plumbing systems for commercial, institutional and light industrial facilities
  • - Calculations of: thermal/cooling loads, Fire extinguishing system, Smoke control system in corridors and parking lots, Sewage disposal system, Fresh air system, power house equipment capacity, chiller, pumps, hot/make up water tanks reservoir, hydraulic analysis of water supply, sprinkler system
  • - Piping system design: Choosing the diameter of cooling and heating pipes of the building, design of pipelines and risers, designing the branches of the plumbing of the floors, cold, hot and return water piping design
  • - Performance at this level requires developmental experience in a professional position
  • - Experience with Carrier HAP or similar building modeling program
  • Supervisor of mechanical facilities
  • - Control of the materials of mechanical facilities: quality, transportation, storage and use in accordance with approved plans and technical specifications and national standards
  • - Controlling the facilities and facilities available in the place, including water, sewage, gas and how to connect the building facilities to the relevant urban networks
  • - Controlling the installation and operation and implementation of facility elements, including the set of valves, pumps and similar items and the necessary insulation
  • - Controlling how to implement elements of supply and distribution of hot and cold water, gas, heating, power house, boiler, etc
  • - Controlling the implementation of elements of the collection, treatment or disposal of sewage and ventilation systems
  • - Controlling the implementation of elements of the air conditioning system and providing fresh air and exhausting polluted air
  • - Controlling the implementation of cooler channels and installing coolers
  • - Documenting and recording and completing the building information booklet

Supervisor of building gas piping facilities

01.2014 - Current
  • - Quality control of urban gas transmission pipes and gas supply equipment
  • - Controlling the welding quality of gas pipes and testing it with air compressed and piezometer (Barometer)
  • - Control of qualification and work quality of gas operator
  • - The quality of basic installation of gas valves and the path of gas pipes
  • - Controlling the correct and principled path of the chimneys of gas-burning appliances
  • - Quality control of chimney materials, chimney connections
  • - Controlling the implementation of the fresh air in all required spaces
  • Supervisor of the gas piping facilities of special applicants' buildings (2 pound Industrial)
  • - Examining the executive's employment license, reviewing the technical skills license of executive agents and executive equipment (Welding, testing, insulation and X-ray equipment)
  • - Control and approval of plans and calculations of gas piping system and list of materials in terms of quantities
  • - Control and approval of the technical specifications of the materials, consumables required for the gas piping system based on the subject of the national standard
  • - Control and approval of the tests performed according to the defined regulations
  • - Supervision and control of the correctness of all gas piping implementation steps until gas flow is established
  • - Reporting violations committed by the contractor and the applicant during or after the completion of the work
  • Supervisor of water and sewage facilities
  • - supervising the implementation of systems: rain's water, wastewater, wastewater vent, water supply, fire extinguishing, swimming pool

Production Supervisor

BUTANE
01.2015 - 09.2024
  • Managed the daily operations, like assembling lines, overseeing4 production lines of170 personnel
  • The transfer agent for the assembly line of BOSCH gas boiler to Butane company (economy models) Aug2016 till April2018 (work instruction, assembly line lay out, control plan (CP) and so on)
  • Preparing of new assembly line such as lay out, design and manufacture of new equipment, training of operators and so on
  • Control and analysis of defined KPIs for assembly and efforts to realize and improve its indicators
  • Supervise recruitment/dismissal of labor force,5s
  • Effective and efficient communication with other units such as R&D, Technical support, quality control, warehouses and human resources
  • Audited the existing processes as well as identified the critical gaps and designed new corrective procedures, after which I wrote work procedures, trained staff and achieved certification
  • Implemented a quality improvement program, including spot audits, root-cause analysis, and the implementation of remedial actions
  • Single-handedly, handled customer complaints and collaborating with production engineers and QC to identify and solve issues
  • Demonstrated strengths in oral and written communications
  • Facilitated numerous Root Cause Failure Analysis Investigations in regard to Safety and Equipment failures
  • Served as the Maintenance Team Manager, directly accountable for setting schedules for preventive maintenance
  • Worked and collaborated with site teams to develop the best practices for PM and maintenance in the assembling
  • Produced short/long term production scheduling and forecasting and weekly, monthly analysis, and rework and nonconformity
  • Managed team of [Number] production associates, overseeing productive production processes and meeting all deadlines.

Technical Support Engineer

Kalup
01.2014 - 01.2015
  • Designer and expert and PM responsible to the mechanic workshop

CFD and Hydrodynamic Head

Naghsh Sanat Meraj
01.2011 - 01.2014
  • Responsible for CFD simulation and Designing of piping

Education

Master Science - Mechanical Engineering, Energy Conversion

Isfahan University of Technology
01.2012

Bachelor - Mechanical Engineering, Heat and Fluids

Shahid Rajaei
01.2008

Skills

  • Mother tongue
  • Pesian
  • English
  • Other language(s)
  • UNDERSTANDING
  • SPEAKING
  • WRITING
  • Listening
  • Reading
  • Spoken interaction
  • Spoken production
  • UI
  • Communication skills
  • Good communication skills gained through my experience as pruduction supervision
  • Organisational / managerial skills
  • Excellent leadership (currently responsible for140 people)
  • Job-related skills
  • Good command of quality control processes (currently responsible for quality audit)
  • Computer skills
  • Replace with your computer skills Specify in what context they were acquired Example:
  • Good command of Microsoft Office tools (word, Excel, Power Point)
  • CFD software and CODE: ANSYS-CFX, ICEM, TurboGrid, CFD-Post
  • CAD software: CATIA, AutoCAD(2D)
  • Carrier(HAP), FluidSIM, Outlook, Pipe and Duct Sizer
  • Driving licence
  • B

ADDITIONAL INFORMATION

  • Publications
  • Publication of a scientific research article in the journal of Tabriz University “Performance evaluation of three-stage axial compressor and one-stage centrifugal compressor”.
  • Presentations
  • Presentation of the12th International Aerospace Conference of Amirkabir University of Technology2013 “Evaluation of compressor performance of a turboshaft engine using numerical simulation of rotating components”.
  • . Presentation of the12th Kish Maritime Conference “Investigating the effect of submarine body wake on its propeller performance using numerical solution of the flow”.
  • Presentation of the12th International Aerospace Conference of Amirkabir University of Technology2013 “Evaluation of the turbine performance of a turboshaft engine using numerical simulation of rotating components”.

Certification

Deutsch Lehren Lernen (DLL)

play instrument, do sport, listen musik

I am playing Santoor (traditional Iranian music instrument), and I am doing sport and I go to gym. I am listening music in the free time. 

Languages

Deutsch
Upper intermediate (B2)
English
Upper intermediate (B2)

Summary

Senior Mechanical Engineer with 13+ years of experience, specializing in HVAC, plumbing, piping, fire-fighting systems, and mechanical building services. Skilled in CAD modeling, CFD simulations, and project management to ensure innovative and efficient designs and execution.

Accomplishments

  • Installed and operated 2 local boiler production lines, ensuring 100% functionality and alignment with production goals.
  • Achieved 100% successful transfer of the BOSCH heating assembly line to the factory.
  • Improved productivity by 63%, increasing daily output from 920 to 1,500 gas boilers.
  • Decreased rework from 8% to 3%, enhancing overall production quality and reducing waste through effective measures.
  • Resolved product issue through consumer testing.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Supervised team of 170 staff members.
  • Successfully designed hydraulic tools tailored to the company's production requirements.
  • Implemented an efficient PM program, ensuring improved operational reliability and reduced downtime.
  • Successfully performed advanced CFD simulations to solve complex engineering problems.
  • Delivered high-quality hydraulic piping designs tailored to client specifications.

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Work Preference

Work Type

Full TimeContract WorkInternship

Work Location

On-SiteRemoteHybrid

Important To Me

Work-life balanceFlexible work hoursPaid time offWork from home optionHealthcare benefitsPersonal development programsTeam Building / Company Retreats4-day work weekPaid sick leave401k matchStock Options / Equity / Profit SharingCareer advancement

Software

AutoCAD

SolidWorks

CATIA

Microsoft Office

Outlook

Autosprink

Ansys-CFX

ICEM

TurboGrid

Carrier(HAP)

Duct Sizer

Interests

Serie

Sport

Music instrument

Traveling

Quote

Would you like me to give you a formula for success? It's quite simple, really: Double your rate of failure.You are thinking of failure as the enemy of success.But it isn't at all. You can be discouraged by failure or you can learn from it, so go ahead and make mistakes. Make all you can. Because remember that's where you will find success.
Thomas J. Watson

Timeline

Production Supervisor

BUTANE
01.2015 - 09.2024

Designer, Supervisor of mechanical Facilities (as1st grade)

01.2014 - Current

Supervisor of building gas piping facilities

01.2014 - Current

Technical Support Engineer

Kalup
01.2014 - 01.2015

CFD and Hydrodynamic Head

Naghsh Sanat Meraj
01.2011 - 01.2014

Bachelor - Mechanical Engineering, Heat and Fluids

Shahid Rajaei

Master Science - Mechanical Engineering, Energy Conversion

Isfahan University of Technology
Farhoud Nicknezhad