I am an enterprising and 6+ years experienced, detail-oriented young professional candidate intending to continue my
career in management post, I think in terms of results and objectives, I am enthusiastic, dedicated, committed and reliable,
with a natural determination and persistence to achieve goals. I work with decisiveness and conviction. I have a proactive
attitude to work with team. Always find positive ways to simulate and engage with people.
Overview
8
8
years of professional experience
9
9
years of post-secondary education
Work History
Civil Project Engineer
Providence Doytch Group
10.2022 - 03.2023
Supervising civil works such as excavation, backfilling, RC and piling works
Preparation of tender BOQs’ according to the drawings
Undertaking in process inspections of subcontractors’ works
Preparation of civil works method statement per each work
Coordinating Engineering deliverable documents from subcontractor according to the VDDL
Preparation of reports for daily and weekly basis for top management and client
Field Technician
Baker Hughes
Azeri, Central
04.2022 - 09.2022
East, Shah Daniz Bravo O&G Platforms)
According to the isometric drawing rigging up manifolds and installation of pipelines, manifolds
PSV, PT and TT for hydrostatic test
During the test, monitoring of temperature, pressure and daily bases reporting of these
After complete test depressurize tested line and prepare for pigging action
Equipment preparation and installation of line for drying of line
According to the test pack, reporting of completed lines daily and weekly basis
Tracking Engineering, Procurement and Construction activities considering to the project
schedule
Coordinating Engineering deliverable documents from subcontractor according to the VDDL
Communicate with subcontractors daily to interpret their needs and requirements and
represent them in the field
Resolving all issues with vendors (coordination of assistance at site, claims and back charges,
visit to workshops to follow up and expedite construction progress)
Tracking and control redline/as built drawing for each discipline
Lead Vendor corresponding meetings and site visits
Liaison between vendors and site engineering team
Follow up design deliverables for MES approval according to Project schedule
Quantity Surveyor
Bos Shelf LLC
03.2020 - 05.2021
Preparing project databases according to E&I, Piping and Structural drawings
Updating project database by taking quantities as per the revised AFC drawings of related
disciplines
Updating actual progress in the project database according to the daily reports provided by
construction team
Monitoring construction progress in weekly basis by site visits
Coordinating with QC department in order to align project database with certified progress
Preparing Payment Certificates as per the actual progress on site and approved prices in
contract
Evaluating Payment Certificates of subcontractors as per certified progress reports and
contract compatibility
Measure quantities and prices of all additional works performed at site which are not included
in contract
Preparing of weekly and monthly progress reports
Site Engineer
URBN LIMITED
10.2017 - 10.2019
Supervising dismantling and installation of sheet piles
Supervising civil works such as excavation, backfilling and piling works (1750 piles)
Arranging and controlling of RC works (formwork, reinforcing and concreting)
Inspection of waterproofing works (18000 m2 area)
Supervising of steel works (welding and fitter's works)
Following the progress of steel works
Undertaking in process inspections of subcontractors’ works
Assist with defecting as per the established process
Complete the Daily Report with sufficient and accurate detail
Notifying the Construction Manager of any defects identified
Project Control Engineer
Gilan Holding
07.2017 - 09.2017
Preparing BOQ according to tender documentation
Assisting to commercial manager and Quantity Surveyor preparing project budget
Checking work inspections issued by contractors for interim payment certificates
Intern Quantity Surveyor
Gilan Holding
07.2016 - 06.2017
Preparing material takeoff according to final design and shop drawings
Assisting to commercial manager and Quantity Surveyor in preparing project budget according
to BOQ and unit prices
Supporting procurement manager in preparing PO and PR
Maintaining photographic records of the site progress
Intern Civil Engineer
07.2015 - 08.2015
Deputy Site Manager
02.2015 - 06.2015
Baku 2015 European Games Operation Committee
Construction observation
Monitoring daily site activities and reporting venue management about constraints and
bottlenecks on site
Making solutions for the site issues coordinating with contractors and suppliers
CERTIFICATES
Crescent
AECOM
Coordinate between subcontractors and trades
Calculation of quantities of materials for work to be performed
Following and reporting the progress of RC works
BOSIET
01.2026
HUET & EBS) 14.04
BOSIET WITH CA-EBS 14.04.2026
Education
Master degree - Water Engineering
Magdeburg-Stendal University of Applied Sciences
04.2023 - Current
Bachelor degree - undefined
Azerbaijan University of Architecture and Construction
09.2013 - 07.2017
Construction Engineering - undefined
Guba Private Turkish High School
09.2008 - 05.2013
Skills
Computer Auto CAD - Intermediateundefined
Timeline
BOSIET
01.2026
Master degree - Water Engineering
Magdeburg-Stendal University of Applied Sciences
04.2023 - Current
Civil Project Engineer
Providence Doytch Group
10.2022 - 03.2023
Field Technician
Baker Hughes
04.2022 - 09.2022
Project Engineer
Técnicas
05.2021 - 04.2022
Quantity Surveyor
Bos Shelf LLC
03.2020 - 05.2021
Site Engineer
URBN LIMITED
10.2017 - 10.2019
Project Control Engineer
Gilan Holding
07.2017 - 09.2017
Intern Quantity Surveyor
Gilan Holding
07.2016 - 06.2017
Intern Civil Engineer
07.2015 - 08.2015
Deputy Site Manager
02.2015 - 06.2015
Bachelor degree - undefined
Azerbaijan University of Architecture and Construction