To supervise the specialist team of drilling engineers and provide technical advice to the Drilling Operations Departments on procedures and equipment required to improve cost effectiveness, operational efficiency and the safe delivery of current and proposed drilling projects.
Supervise and coordinate the activities of assigned staff to ensure that the work of the section is completed in a timely and effective manner.
Provide solutions to the operations departments by analyzing drilling performance and developing methods to optimize operational efficiency.
Develop innovative designs and procedures for CLIENT drilling operations and ensure input of these solutions into future field development projects as well as ongoing operations.
Initiate and lead studies to improve procedures and implement new technology for the purpose of achieving safe, efficient and cost-effective wells.
Recommend the standards for drilling equipment and materials for both offshore and onshore operations considering the cost, operational efficiency and safety aspects.
Provide support to the operational team by ensuring all software (e.g., data base software and technical software) required for effective management of drilling information and planning are available and accessible, and that required personnel are trained on its applications to enhance operational efficiency and ensure data integrity
EPD Senior Drilling Engineer
ICOFC
01.2018 - 02.2020
Drilling engineering Lead
Pars Petro Zagros
07.2008 - 01.2018
Sub Surface Project Manager of AZAR Filed Project
Responsible for programming of 8 rigs engaged on gas wells (ICOFC).
Responsible for programming of 6 rigs engaged on gas wells (IOOC).
Responsible for programming of 4 rigs engaged on gas wells (Persia Oil & gas).
Working as a Senior Drilling Engineering my responsibilities include for study and determining the best method of for drilling wells to optimize the drilling operations set forth for the field development, completion procedures and well cost analysis for various methods.
Establish a close relationship I work closely with the reservoir engineering group and Geology team to set criteria for the bottom hole locations of the wells required to efficiently produce the gas or oil.
Estimated drilling parameters, ROP, bottom hole assemblies’ composition, and etc.
Preparation of a general drilling program.
Casing sizes, types and casing design.
Designs of the mud program for different parts of the hole.
Proposal for specific mud control equipment.
Preparation of a list of necessary tools and equipment.
Preparation of deviation plans for the directional wells.
Selection of the best trajectory for the holes in with respect to the platform location and target area at reservoir level.
Determinationing position of the kick-off points, with respect to considering the buildup rates
Consideration of all aspects of the materials and consumable.
Continuous controls monitoring of drilling times, and making creation of necessary graphs to follow the track drilling progress against the program.
Follow up on drilling time against drilling progress.
Participation in the daily operation meetings.
Preparation of Drilling drilling Reports reports on Daily daily, Weekly weekly, and Monthly monthly basis.
Drilling Supervisor
OEID
01.2007 - 01.2008
Work with other professionals, such as geologists and geoscientists to Monitor monitor Drilling drilling processes.
Supervising drilling and solving technical problems.
Making necessary operational calculations, checking third parties out puts for final approval and execution.
Trying to optimize ROP and saving rig time based on field experience in Bit bit selecting, Hydraulic hydraulic effects, drilling parameters, and BHA optimization in order to save time and get maximize rig performance.
Preparing daily instructions, and writing procedure for especial jobs to keep ensure safety, save time and do achieve perfectionly.
Ensuring proper execution of the drilling program is executed properly by the drilling contractor and service providers.
Scheduling and planning for equipment, material and services to avoid prevent any operational delays.
Preparing daily drilling reports.
Prepared Creating necessary field reports such as including section summaries, casing, and cementing reports, bit records, completion reports and end of well reports
Trying to optimize operational performance without compromising HSE
Prepared up Maintaining an up to date rig inventory and requirements list.
Air Drilling Site Engineering
NIDC
01.2005 - 01.2007
Wellsite & MWD engineer
NIDC
01.2003 - 01.2005
Education
Phd - Chemical engineering
Science and Research Branch
M.Sc - Energy Engineering Economic
Science and Research Branch
Skills
Computer
Petroleum Engineering Software
Landmark (Well Plan)
Drilling office
Energy Economic
Microsoft Office Package (Word, Excel, Power Point)
Programing Software
MATLAB
Certification
Drilling Equipment, Iran-Ahwaz, NIDC
Air Drilling, Iran-Ahwaz, NIDC
MWD, Iran-Ahwaz, NIDC
Piping, Iran-Tehran, Amir Kabir University
Drilling Pump & Engines, Iran-Ahwaz, NIDC
Computer, Iran-Ahwaz, NIDC
Six Month Fundamental Drilling Courses which were held up in Pars Petro Zagros Company Consisting: Drilling Rig component
Drilling Problems
Drilling Bit
Drilling Mud
Cementing
Logging
Directional Drilling
Casing design
Hydraulics
Drill string design
Well Head
Well Completion & Completion string
Coiled Tubing
Perforation
Fishing
Well Control
Drilling Policy
Basic Geology
Basic Reservoir Engineering
Report Writing
Landmark software
Language
English: Good
Persian: Native
Publications
Using water based mud in drilling Asmari shales and the beginning of Pabdeh in one of the fields of southwest of Iran (The 8th International Conference On Chemical and Petroleum Engineering)
An overview of the emissions and power of gas-burning and gasoline-burning (The 6th International Conference On Chemical and Petroleum Engineering)
Evaluation of environmental consequences and social costs of energy consumption in Iran's transportation sector (Quarterly Energy Economics Review)
Modeling and removal of hydrogen sulfide polluting gas from biogas produced by anaerobic digester of chicken manure and food waste in a batch reactor (Iranian journal of Energy)
Programming Engineer, Head of Department at FlexiCAM's CNCRouter Fibrex Construction Group EGProgramming Engineer, Head of Department at FlexiCAM's CNCRouter Fibrex Construction Group EG