Summary
Overview
Work History
Education
Skills
PROJECTS
PROFESSIONAL MEMBERSHIP
REFEREES
Timeline
Generic

MANASSEH DOKU ADJARTEY

Vancouver

Summary

Knowledgeable and proactive Mineral Processing Engineer with over 10 years experience in the gold mining industry matched with broad ranging exposure, whose goal is to ensure consistent growth in the company's production, safety of workers and the environment, as well as assisting to set and achieving realistic targets.

The objective is to use the acquired knowledge and experience in solving practical problems to push corporate targets in a team environment and the prospect for growth and development motivates me.

Overview

13
13
years of professional experience

Work History

Senior Metallurgist (Contract)

Evolution Mining Limited
06.2022 - 05.2023
  • Worked closely with operations, maintenance, and other departments to ensure environmental compliance, the safety of the operation, and equipment maintenance
  • Ensuring all employees work safely and under applicable legislation, company policy, standards, and procedures.
  • Supervised and sign-off monthly gold production and metallurgical accounting reconciliation for both mills
  • Prepared monthly downtimes, utilization and mill availability reports for the operations
  • Prepared monthly gold in circuit (GIC) and concentrated shipment balance reports for the operations
  • Assisted in auditing and developing a working Metallurgical Accounting procedure and processes to meet international standards (AMIRA P754)
  • Coordinated all production activities to maintained established targets
  • Daily troubleshoot a 2000tpd and 1000tpd gold processing plants configured with jaw and cone crushers, rod, ball and verti mills, knelson concentrators,flotation, POX, CIL, CIP, Elution, DETOX and Paste backfill plant.
  • Conducted investigations, test work, and technical projects to maintain the performance or to identify opportunities to exceed targets
  • Planned out weekly, month, yearly and Life of Mine (LOM) mill production forecast schedules, cost forecasting, long-term strategic and capital projects
  • Calibrated and verified accuracy of density meters and cyanide analyzers.
  • Trained, supervised and led Metallurgists by example (Visible Felt Leadership style)
  • Was the Met-rep on the mineralogical study of the ore zones and the processing optimization study (Geometallurgy)
  • Was the Met-rep on the cyanide code re-certification project (ICMC)
  • Was the Met-rep on the RLO continuous improvement team
  • Relieved the Metallurgical Superintendent when required

Senior Metallurgist (Contract)

Process Mineralogical Consulting Limited
01.2022 - 03.2022
  • Produced Technical Documentation for various clients
  • Led R & D initiatives
  • Developed process flow diagrams (PFDs) and piping & instrumentation diagrams(P&IDs) for various projects
  • Completed settling test, bulk & sequential flotation, hydrofloat, grind calibration curve establishment, and gravity recoverable gold (GRG) on various ore types (gold-silver, gold-copper-zinc, copper-molybdenum ores)
  • General Laboratory and Project Management
  • Routine communication with clients, peers, and subordinates involved in each project
  • Ensured the health and safety of the staff and organizing training programs.

Senior Metallurgist

Golden Star Resources, Bogoso\Prestea Gold mines
03.2015 - 11.2018
  • Prepared the mill schedules and reagent assumptions for a 3.5 Mtpa refractory (Sulphide) and a 1.5 Mtpa non-refractory(Oxide) plants; configured with gyratory and jaw crushers, SAG, Ball & Regrind mills, gravity (knelsons, shaking table & Acacia), flotation, biological oxidation (BIOX for refractory concentrate pretreatment), Counter Current Decantation (CCD), effluent Neutralization, elution & electrowinning, and Refinery
  • Prepared OPEX and CAPEX (operational and capital expenditure), etc., of the Company's BUDGET
  • Performed QA/QC of Metallurgical assay data and execute in-house metallurgical projects
  • Performed accounting and reconciliation for both process plants, as well as prepare metallurgical reports
  • Assisted with the Metallurgical & Assay Laboratories Management & Optimization
  • Setting monthly reagent addition rates and stock management.
  • Documented and certified mill consumables (reagents & grinding media) quality of each batch( randomly) delivered to the processing plant.
  • Prepared and issued monthly Metallurgical reports such as Downtimes, Utilization & Availability, Lab Vs Plant (for plant optimization), and Pit-by Pit (estimation of gold poured from each mining pit for royalty payments)
  • Trained Metallurgists and National Service Personnel on best Metallurgical procedures and processes(AMIRA P754)
  • Helped Metallurgists and Technicians setup laboratory test works for plant investigations and optimizations
  • Organized annual refresher cyanide training (ICMC) for Plant, Metallurgical & Assay Laboratory and Maintenance staff
  • Acted as the Metallurgical Technical Services Manager on June 2014
  • Relieved the Chief Metallurgist when required
  • Relieved the ICMC Coordinator when necessary

Plant Metallurgist

Golden Star Resources, Bogoso, Prestea Gold
09.2011 - 02.2015
  • Supervised plant operators and technicians on routing plant operation task
  • Performed monthly sampling, metallurgical accounting and reconciliation across the sulphide and oxide plants
  • Monitored plant operating parameters and reported deviations to optimized the control philosophy
  • Setting reagent addition rates and stock management
  • Performed metallurgical and assay laboratory works (e.g. sample preparation, moisture content determination, bottle-roll, flotation, bulk density, grind sensitivity, carbon activity, work index determinations, diagnostic leach (gold deportment),acid-digestion and AAS & LECO)
  • Performed mill surveys and implemented the results to help optimize plant throughputs and recovery
  • Routinely inspect the mills, measure liners for wear, plan the delivery of critical wear parts and schedule mill relines.
  • Daily/Monthly evaluating plant sampling practices and procedures
  • Calibrated and verified accuracy of density meters along the metal accounting steams, multi-stream analyzers (MSA), and TAC cyanide analyzers

Trainee Metallurgist

Golden Star (Bogoso/Prestea) Limited
10.2010 - 07.2011
  • Assisted in the preparation of daily production reports and monthly metallurgical reconciliation reports
  • Involved in the daily and routine plant sampling
  • Prepared standard operating procedures (SOP) for various sections of the plant
  • Daily calibrated process instruments (pH meters, dissolved oxygen meters and REDOX meters)
  • Routinely performed volumetric drop/rise tests
  • Helped in SCADA room operations


Education

Master of Engineering - Mining Engineering

University of British Columbia
Vancouver, BC
04.2023

Certificate - Mineral Processing Economics & Sustainability

University of British Columbia
Vancouver, BC
09.2021

MBA - Management

International Graduate Center, Hochschule Bremen
Bremen, Germany
09.2021

Master of Science - Minerals Engineering

University of Mines & Technology
Tarkwa, Ghana
06.2019

Bachelor of Science - Mineral Engineering

University of Mines & Technology
Tarkwa, Ghana
06.2010

Skills

Management Skills

  • Business Improvement Training, ACPE Inc, GSR
  • Continuous Improvement (CI) Training, Process Management, RLO
  • Metallurgical Accounting Training, JK Tech, Ghana
  • Indigenous People in Mining Training, UBC, Canada
  • International Accounting & Corporate Data Analysis Training, IGC, Germany
  • International Sourcing & Procurement Logistics Training, IGC, Germany
  • Global Logistic Training, IGC, Germany
  • Project Management Training, IGC, Germany
  • International Business Law & Taxation Training, IGC, Germany
  • Cross-Cultural Management Training, IGC, Germany

Software

  • Microsoft Office (Advanced Excel, Word, PowerPoint and Outlook)
  • IDEAS Simulation / JKSimMet
  • GOLDSIM Water Balance
  • CITECT/SCADA and Log Viewer
  • System Application and Product (SAP)
  • MolyCop Tools
  • PRONTO / LIMS
  • Delta V / Foxboro DCS

Key Knowledge and Skills

  • Project Management Processes
  • Metallurgical Accounting (Gold-Silver, Base Metals)
  • Metallurgical Mass & Water Balance
  • Process plant Optimization and Continuous Improvement
  • Metallurgical Test works and Assay Lab Operations
  • Crusher, Milling, Gravity & Acacia (ILR), Flotation, BIOX, POX, CIL, CIP, Elution & Electrowinning, Cyanide Detoxification, Effluent Treatment Plant (ETP), Paste Backfill and Refinery Optimizations
  • Surface and Underground Mining

PROJECTS

  • Commissioned and ramp-up of 1.5 Mtpa Oxide Processing Plant 2 weeks ahead of schedule, exceeding designed tonnage by 26% and 2% within operating budget cost (Greenfield)-GSR
  • Successfully De-commissioned a 3.5 Mtpa sulphide plant and placed it under care and maintenance (Brownfield)-GSR
  • Spearheaded the recertification project of the International Cyanide Management Code (ICMC) at the Bogoso/Prestea mine- GSR
  • Neutralized acidic CCD effluents using seashells from BAYNET Limited. The project was implemented at GSR with approximately annual savings of $1.8 m
  • Developed a purchase to pay (P2P) module (based on plant reagents and consumables) to help deal with suppliers when the sulphide processing plant was placed under care and maintenance and to ensure continuous operation of the oxide processing plant- GSR
  • Performed test work and implemented the addition of Tannin (plant based coagulant) to the CCD to curb colloidal gold losses and increasing overall recovery by 2% - GSR
  • Investigated BIOX microbe nutrients (NPK) bioavailability within the reactors and developed a module to reduce nutrient addition by 10%- GSR
  • Prepared a business case for the installation of a calcination oven to help curb gold losses to slag (matte/metallic slag) and improve bullion fineness from 80% to 90%- RLO
  • Prepared a business case for the installation of an Acacia (ILR) to improve gravity recoverable gold (GRG). The project is estimated to improve GRG from 40% to 70%- RLO
  • Redesigned gravity screens and optimized the knelson concentrators operation to increase GRG from 30% to 40%- RLO
  • Revamped the usage of TAC 1000 cyanide analyzer to control cyanide dosage; an initial cost savings of 5% was recorded but further optimization could yield more cost savings by reducing cyanide consumption. Leach recovery could also be improved by the stable control philosophy employed by the cyanide analyzer as compared to the manual dosage-RLO
  • Developed a module to monitor DETOX reagent usage (based on the WAD cyanide in the feed) which helped reduced the reagent consumption by 5%- RLO
  • Improved elution efficiency from 95% to 98% by changing the sequencing strategy. This intend improved the relative carbon activity of the regenerated carbon and also improved the subsequent carbon loadings- RLO
  • Involved in the mill expansion project at the RLO Campbell mill that increased throughput from 2000 tpd to over 2300 tpd and still pushing the limits to 2500 tpd. The optimization started with modification of the crushing system to reduce the p80 from 14 mm to 7 mm and also providing the required crushed feed tonnage within 12 hours. Grinding efficiency was improved by media blend (balls & rods), slurry density optimization and vortex finder (VF) and spigots change on existing cyclones-RLO.

PROFESSIONAL MEMBERSHIP

WEST AFRICAN INSTITUTE OF MINING, METALLURGY AND PETROLEUM. 2014 - DATE

PROFESSIONAL ENGINEER (PEng)- In progress. DEC 2023

REFEREES

Upon request

Timeline

Senior Metallurgist (Contract)

Evolution Mining Limited
06.2022 - 05.2023

Senior Metallurgist (Contract)

Process Mineralogical Consulting Limited
01.2022 - 03.2022

Senior Metallurgist

Golden Star Resources, Bogoso\Prestea Gold mines
03.2015 - 11.2018

Plant Metallurgist

Golden Star Resources, Bogoso, Prestea Gold
09.2011 - 02.2015

Trainee Metallurgist

Golden Star (Bogoso/Prestea) Limited
10.2010 - 07.2011

Master of Engineering - Mining Engineering

University of British Columbia

Certificate - Mineral Processing Economics & Sustainability

University of British Columbia

MBA - Management

International Graduate Center, Hochschule Bremen

Master of Science - Minerals Engineering

University of Mines & Technology

Bachelor of Science - Mineral Engineering

University of Mines & Technology
MANASSEH DOKU ADJARTEY