M/V Storno
Under this contract, we prepared the vessel for operation after a period of inactivity in port, including necessary technical inspections and maintenance work.
MV Queen Rinas | I spent my entire contract at the dock. I, under the leadership of 3 mechanics, serviced and repaired the main and auxiliary engines
MV Odin Fender| I spent 4 weeks of my contract in dry dock. I, under the leadership of 2 and 3 mechanics, prepared the vessel for the project
MV Miss Peggy| Assisted engineers with fuel indicators and pumps replacement on main engines, major overhaul of Alfa Laval fuel oil purifier.
Performed cooling water system butterfly valves inspection and replacement if needed with fitter during dry dock.