I am an experienced proactive professional individual with almost 4 years of civil construction experience in engineering, managing along with delivering the infrastructural projects on time with respect to clients specifications along with cost constraints. Ability to handle pressure situations smartly, simultaneously thriving for the best result. My aim is to acquire a challenging position wherein I can enhance my knowledge, management, Chartered Civil Engg. skills along with practical experience in the global dynamic, sustainable corporate working environment.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Site Engineer
HS2 Balfour Beatty VINCI
07.2023 - Current
Monitoring health and safety standards according to the companies protocols with respect to ITP, RAMS and British standards.
Closely inspecting and monitoring the concrete mix design i.e. (C65/70) by visiting the batching plant and analysing any factors causing any change in the mix design.
Keeping a track of all pre-cast tunnel segments along with delivered steel reinforced cages with performing quality dimension check on them.
Planning, design, execution, and quality control, ensuring the successful delivery of the tunnel segments further used for high speed railways.
Updating the existing documents like RAMS, emergency preparedness plan and all the investigation reports for any incidents on site.
Site Engineer
Hinkley Point C, Balfour Beatty
07.2022 - 07.2023
Working on complex reinforcement and tedious concreting which ties with UK's nuclear grade standards.
Developing, accessing, and reviewing Risk Assessment and Method Statement, Task Briefing Sheets for site-specific scope of tasks, and briefing teams with work activities.
Composing and amending Inspection Test Plan (ITP) for scope of work according to client's specifications and manufacturers guidelines.
Raising requisition and keeping close track with commercial team for tracking work specific tools, materials, and plants along with off-hiring same.
Raising internal quality and client inspections which are correlated with ITP.
Supporting and constantly inspecting work-related activities such as leveling of rapidshor tower, alignment of soffit level, placement of rebars.
Keeping in close contact with our vendors for getting a quick turnaround for issues/problems to be resolved soon as possible.
Keeping safety as first priority for individual or team to carry out the construction activity smooth and without any interruptions.
Constantly communicating with the Health, Safety & Environment team for all necessary precautions and preventive measures.
Junior Site Manager
Suyojit Infrastructure Pvt. Ltd
06.2018 - 12.2019
Estimated quantity of material required for different component parts of building.
Supervised on artificial canal digging with managing working staff and checking depth with help of Auto dumpy level.
Personally evaluate scheduling of material with respect to speed of construction or material availability.
Conducting health & safety awareness training for all employees.
Supervised pouring of avg. 65 cubic meters of concrete for slab cast.
Assisted in conducting soil investigation testes, cube test, pile test.
Reporting daily progress of project to senior authority i.e. Site Manager, Construction Manager.
Attending on-site and off-site meetings with clients, sub constrictors, vendors.
Resolving any conflicts on site which may cause any kind of delay in construction progress.
Monitored and controlled project by adapting critical path method and help reduce overhead expenses of company up to 25%
Assistant Site Engineer
Panchashil, PANCHS HIL TOWERS
01.2017 - 01.2018
Assisted work on Mivam (Auminium) formwork construction technique
Off-site bath pod manufacturing according to all the standard specifications
Carried out surveying & construction of raft foundation with properly supervising the laying of reinforced steel and ties
Inserting tendons with ducts and anchors for the Post Tension Slab
Supervising the tension provided by the stressing jack after the concrete has achieved its maximum strength
Supervising the construction of shear walls to provide the structure extra support and stability
Performing quality checks of concrete: Slump Cone Test, Compressive Strength
Test which are necessary for the better lifespan of the build structure
Managed site inductions and safety briefings, ensuring full staff compliance with Mivan formwork construction regulations
Conducting timely workshops for labors expanding the importance to follow all the safety guidelines before working on the construction site.
Education
Master of Science - Construction Management
University Of Salford
Manchester, United Kingdoms
05.2021
Bachelor of Science - Civil Engineering
Symbiosis Institute of Technology
Pune, India
06.2018
Skills
Engineering Supervision: Civil Construction
Supervision: Construction Management
Office, Admin and Clerical: Construction Scheduling
Logistics: Production Management
Logistics: Scheduling
Purchasing: Procurement
Engineering Techniques: Inspections
Risk Mitigation/Management
Certification
Building Information Modeling (B.I.M)
AutoCAD 2D
Primavera P6
AutoCAD 3D
Confined Space trained (Low-Medium risk)
Navisworks
Harness trained
Manual lifting trained
Microsoft office
Languages
English
Bilingual or Proficient (C2)
Hindi
Bilingual or Proficient (C2)
German
Beginner (A1)
Timeline
Site Engineer
HS2 Balfour Beatty VINCI
07.2023 - Current
Site Engineer
Hinkley Point C, Balfour Beatty
07.2022 - 07.2023
Junior Site Manager
Suyojit Infrastructure Pvt. Ltd
06.2018 - 12.2019
Assistant Site Engineer
Panchashil, PANCHS HIL TOWERS
01.2017 - 01.2018
Master of Science - Construction Management
University Of Salford
Bachelor of Science - Civil Engineering
Symbiosis Institute of Technology
Similar Profiles
Monique WeirMonique Weir
Finance Cost Administrator at Balfour Beatty Vinci JV HS2Finance Cost Administrator at Balfour Beatty Vinci JV HS2